A preflight prevents the formal study from becoming the first time the team discovers a missing adapter, wrong voltage, incomplete fill, blocked route or unusable camera angle.

Before moving into the area

  • Confirm model, serial number, manual revision and approved configuration.
  • Inspect enclosure, wheels, cables, hoses, fittings and relief components.
  • Verify electrical service and extension restrictions.
  • Confirm LN₂ vessel, quantity, route and trained transfer personnel.
  • Verify water type, lot/source, fill container and hold time.
  • Confirm floor loading, door clearance and staging location.

Before fog release

  • Confirm room state and protocol sequence.
  • Verify ODH controls, ventilation and any oxygen monitor.
  • Check output path, hose support and introduction point.
  • Run camera, lighting, identifiers and storage test.
  • Confirm operators, materials and interventions are ready.
  • Perform a short controlled function check outside the critical sequence.

After the study

  • Drain, clean and dry according to the current manual.
  • Record remaining LN₂ and safe disposition.
  • Inspect for condensation, damage or abnormal behavior.
  • Back up raw video and logs.
  • Document deviations, maintenance needs and configuration changes.